T

Senior Project Engineer - Electrical Focus for Data Centre Construction

TGS International Group

Frankfurt, Hessen, Germany · Full Time

Be the first to apply

Experience
Any
Salary
EUR 60,000 – EUR 80,000 / year
Openings
1
Posted
4 weeks ago
Work mode
In office
Education
Engineering degree or related qualification
Resume
Required to apply

Where you'll work

Sign in to tell us what does and doesn't work for you here — it sharpens every match we show you.

Job description

About the Role

We are partnered with a prominent mechanical and electrical (M&E) design and build firm known for managing large, intricate projects across Europe and the UK, especially in critical mission and data centre sectors. With growth accelerating in Germany, a skilled Senior Project Engineer is sought to support a key data centre project based in Frankfurt. This permanent full-time position offers a competitive salary between €60,000 and €80,000 alongside a living allowance, accommodation, and flights for a rotation schedule of 17 days on and 4 days off.

Key Responsibilities

  • Evaluating project designs, specifications, and precise technical requirements.
  • Overseeing technical submittals through complete review and approval stages.
  • Generating and managing Requests for Information (RFIs), maintaining accurate logs.
  • Collaborating closely with Project Managers, Design Teams, and Quantity Surveyors to monitor project milestones.
  • Ensuring site teams utilize the latest approved drawings and specifications.
  • Managing redline drawings and aligning as-built documentation with the design team.
  • Monitoring delivery timelines for long-lead equipment critical to the construction schedule.
  • Overseeing subcontractor performance and ensuring compliance with project standards.
  • Participating in site visits and project coordination meetings to streamline communication.
  • Assisting the commercial team with variation handling, change management, and procurement processes.
  • Maintaining adherence to all relevant building codes, technical standards, and environmental health and safety regulations.
  • Supporting commissioning activities, project handover, and creation of operations and maintenance (O&M) documentation.
  • Keeping meticulous project and document control records throughout the project lifecycle.

Candidate Profile

  • Demonstrated experience as a Project Engineer or Senior Project Engineer in mechanical and electrical construction projects.
  • Proven track record on large-scale and technically demanding projects, with preference for experience in data centre or mission-critical environments.
  • Strong expertise in M&E systems and construction execution.
  • Technical proficiency handling submittals, RFIs, drawings, and various project documentation.
  • Excellent coordination skills to bridge design, commercial, and site teams effectively.
  • Educational background in Engineering or related technical disciplines.
  • Proficient in MS Project and Microsoft Office; AutoCAD knowledge is an advantage.

Level

Senior

Minimum education

Bachelor's Degree

Tools & software

Microsoft Project required

How they work

Communication

Leave it if you'd like a reply — we won't use it for anything else.

Click to browse, drag & drop, or paste a screenshot

PNG, JPG, GIF, MP4, WebM, MOV · Max 20MB each · Up to 5 files

🤖
Online · instant AI help
Broxer