Job Description

Job Purpose

To plan and implement process design for new projects in Viscose section. Evaluate alternate technologies, process for improving productivity, optimizing OPEX and CAPEX for new projects.

Job Context & Major Challenges

Job Context

Viscose staple fibre manufacturing started in our business in 1954 at Nagda. At present we have seven fibre plants with manufacturing capacity of around 2600 TPD. In view of further business expansion by incorporation of latest technologies running in world, a separate central project cell has been established. This Project cell is responsible for project designing with aim to get bench mark fibre quality, environmental protection, optimum capex and opex. There are challenges specific to location. Environmental aspects are common for all sites. Water supply as well as discharge is also great challenge at most of the site. Besides above to get benchmark quality with minimum opex, and installation cost

Major Challenges

  • To get global bench mark quality of fibre and Salt.
  • To adopt best technology for plant and machineries.
  • To adopt latest process module established globally.
  • To adopt learning from plants and incorporate in process design.
  • Design for lower steam and power consumption.
  • Design for Maximum productivity, minimum losses.
  • Coordination with plant executing team for correct and timely execution of project.
  • To improve subordinate morale and moderate their behaviour to increase their work commitment

Key Result Areas

KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)

KRA1 Project Design 1. Carry out Engineering of the project with equipment layout for finalization

  • Evaluate latest technologies during engineering
  • Prepare documentation for performance guarantee and scope

with vendors

  • Take up mass and heat balance study of processes for understanding and finding opportunities for improvement in process control, simplification and cost reduction.

KRA10

KRA2 Project implementation 1. Ensure correct purchase orders are released timely.

  • Interact with the respective counter parts in the running plant and sister units for knowledge sharing and up gradation.
  • Co-ordinate for timely implementation of project as per agreed PIDs and design basis.
  • To work closely with the project team members from Electrical, Instrument, Civil and Mechanical for progress of the projects jobs as per target.
  • To plan and execute pre-commissioning activities in the section for smooth and vertical start-up of the project.

KRA3 Safety and Environment-

To implement safety systems and procedures in respective section so as to achieve the target of “zero accident” and sustenance 1. To implement and execute DuPont safety systems and procedure in the respective section.

  • Identify and report safety observation (unsafe act and unsafe conditions) in the Plant.
  • Prepare and put in place personal safety action plan.
  • Carry out risk assessment of critical activities specially hooking up with existing facilities
  • Prepare SOP for all processes.
  • To carry out and implement HAZOP & JSA for the project.
  • Interact closely with safety team for safety related activities in the respective section

KRA4 HR and People Management-

Motivate and Develop people for participative work culture. 1. Train operation team for their specific job

  • Study and check implementation feasibility for suggestions put forward by the workmen about their operations / observations.
  • Execute learning programs for team members to enhance their skills and competencies

KRA5 ISO and Business Excellence quality standards Compliance and Internal Customer satisfaction-

Ensure compliance to ISO and Business Excellence Standards 1.Improve awareness among workmen for compliance of the applicable quality standards

  • Train each work force member on the applicable quality standards.

3 Motivate team members for maintaining high adherence to the quality standards

KRA6

KRA7

KRA8

KRA9